Nmrv Series Worm Gear Reducer with Motor

Nmrv Series Worm Gear Reducer with Motor

RV series Traits

  • RV – Sizes:030-040-050-063-075-one hundred and five-110-130-150
  • Enter Alternatives: with enter shaft, With Square flange,With Input Flange
  • Input Electrical power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-cast aluminium alloy budy and over one hundred ten in cast iron
  • Ratios between 5 and a hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium units are provided total with synthetic oil and let for common mounting positions, with no need to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimension 030 and more than are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Alternatives: torque arm, output flange, viton oil seals, reduced/high temperature oil, filling/drain/breather/level plug,Tiny hole

Fundamental types can be applied to a extensive selection of power reduction ratios from five to 1000.
Warranty: One year from date of delivery.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Assortment:
Type Previous Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine Generate

ZheJiang CZPTshine Drive Co.,Ltd,the predecessor was a state-owned military mould company, was established in 1965. CZPTshine specializes in the total power transmission remedy for high-finish products production industries based mostly on the purpose of “Platform Solution, Software Design and style and Specialist Provider”.
CZPTshine have a strong specialized pressure with in excess of 350 workers at existing, which includes over thirty engineering technicians, 30 quality inspectors, covering an location of 80000 sq. meters and sorts of superior processing devices and testing equipments. We have a good foundation for the industry software improvement and provider of large-finish velocity reducers & variators proudly owning to the provincial engineering engineering investigation heart,the lab of equipment velocity reducers, and the foundation of modern R&D.

Our Team

Top quality Handle
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

 

Nmrv Series Worm Gear Reducer with Motor